Make connectivity part of the brief from the beginning.
Connectivity follows the way a building is used
Workstations, wireless equipment and connected systems all depend on the network around them. Discuss the intended use of the space and the equipment involved before focusing on individual outlets or devices.
Bring routes and rooms into the brief
Structured cabling, fibre links and comms racks need suitable routes and space. Include existing containment, rack locations and the relationship with power and other building services in the project information.
Plan around the wider fit-out
Data work benefits from being considered alongside the layout and installation programme. Share proposed equipment, connectivity priorities and handover requirements so the network infrastructure can be discussed with the other disciplines.